Webster Lake Crew Readies For Rehab Project
On Sept. 22, the Webster Lake Conservation Association had a work day at the Lake Webster Dam. A dozen people helped clear debris and rubble from the former raceway of the Boydston Grist Mill in preparation for the rehabilitation of the Webster Lake outlet structure rehabilitation.
The rehabilitation project at the dam is scheduled to begin Oct. 2. During the project, the Tippecanoe River flow will be routed through the raceway.
Shown in photo are members of the WLCA who took part in the work day. In front, from left, are Jan Osborn, Alyson Troutman and J.B. Routh. In the back are Beth Smith, Kevin Smith, Terry Frederick, Dawn Meyer, Brad Troutman and Tom Plew. Also there, but not pictured, were John Osborn and Jennifer Myers.